1 |
LG Chemical_ LG Chemical TPEE Project |
2018.07~2020.01 |
E |
2 |
Lotte Chemical_Yeosu H-COG, STG(Steam Turbine Generator) PROJECT |
2018.04~2019.12 |
E.P.C |
3 |
Wacker Chemical Korea _L7935 Site Extension Ulsan Project |
2017.03~2019.06 |
E.P.C |
4 |
Kolon Basf_BKA-1 PROJECT "MVR PLANT" Project |
2017.03~2019.02 |
E.P.C |
5 |
Hansol Chemical_Ulsan Steam Power Equipment Project |
2017.02~2018.03 |
E.P.C |
6 |
PT PATRASK_Fundamentals of Process Engineering Trainning |
2016.05~2016.06 |
E |
7 |
Lotte Chemical_¿©¼ö WAO Plant (EPC) |
2016.06~2017.04 |
E.P.C |
8 |
Korea Petrochemical Ind. _SOLUTION PILOT PLANT PROJECT |
2016.05~2017.07 |
E.P.C |
9 |
Kolon Global _BKA-1 PROJECT Engineering |
2016.05~2019.02 |
E |
10 |
Kuraray Korea_Ulsan Line 9 Project |
2016.03~2017.12 |
E.P.C |
11 |
LGMMA_PMMA Solution Process Engineering |
2015.08~2015.12 |
E |
12 |
Samsung Fine Chemical_T-2301 MVR System |
2014.12~2016.04 |
E.P.C |
13 |
Hyundae Oil Bank_#2 HOU Revamp Engineering |
2014.01~2015.06 |
E |
14 |
S-oil_#3 SRU TGCI(Tail Gas Catalytic Incinerator, CB&I Licensor) Project |
2014.03~2014.12 |
E.P.C |
15 |
UGCC Water Treatment Project |
2013.03~2014.05 |
E.P |
16 |
UGCC WAO Project |
2013.01~2014.05 |
E.P |
17 |
THAI UAC PP(Gas Separation) Project |
2012.07~2013.04 |
E.P.C. |
18 |
QLC PX Revamp Project |
2012.06~2013.11 |
E |
19 |
HYUNDAI OIL BANK LNG Pipeline Project |
2012.06 ~2012.09 |
C |
20 |
LG TOYO B2B Pilot Plant Project |
2012.05~2012.09 |
E.P.C. |
21 |
HYUNDAI OIL BANK # 1 Alkylation Revamp Project |
2012.08~2013.06 |
C |
22 |
HYUNDAI OIL BANK Alkylation Revamping(Engineering) Project |
2012.04~2013.06 |
E |
23 |
LG CHEMICAL MS Letdown Facility Project |
2012.03~2012.05 |
C |
24 |
LG CHEMICAL Polishing Slurry Recycling Project |
2012.03~2012.08 |
C |
25 |
S-OIL Tail Gas Catalytic Incineration Project |
2011.07~2012.01 |
E.P.C. |
26 |
SAMSUNG ENGINEERING Eni Zubair DGS South Package Project |
2011.07~2011.08 |
E |
27 |
HYUNDAI OIL BANK BTX FEED Verification Project |
2011.06~2011.12 |
E |
28 |
THAI HMC PP Project |
2011.04~2012.06 |
E.P. C. |
29 |
LG CHEMICAL No.2 CA/EDC Project |
2011.04~2012.12 |
E |
30 |
GS CALTEX No.1 PX Revamp Project |
2011.03~2011.12 |
E |
31 |
QATAR Barzan Engineering Service Project |
2010.09~2010.10 |
E |
32 |
LG CHEMICAL PE Revamping Project |
2010.09~2011.06 |
E.P.C. |
33 |
LG CHEMICAL COLD BOX Project |
2010.09-2010.11 |
E.P.C. |
34 |
YEOCHUN NCC BTX#1 Sulfolane Unit Revamping Project |
2010.09-2010.12 |
E |
35 |
HYUNDAI OIL BANK HDO/ HCP Equipment Project |
2010.04~2010.06 |
C |
36 |
LG CHEMICAL BUTENE-1 Project |
2008.12~2009.06 |
E.P.C. |
37 |
LG CHEMICAL CAA Revamping Project |
2008.09~2009.05 |
C |
38 |
CPC Dearomatic Plant Engineering Service Project |
2008.05~2009.05 |
E |
39 |
LOTTE CHEMICAL NCC/BRU/BDR Intertray Project |
2007.12~2008.06 |
C |
40 |
SAMSUNG TOTAL HPEO Column Revamping Project |
2007.08~2008.03 |
E.P.C. |
41 |
LOTTE CHEMICAL Wet Air Oxidation Project |
2007.07~2008.04 |
E.P.C. |
42 |
LG CHEMICAL OS-BOG Unit Project |
2007.06~2008.04 |
E.P.C. |
43 |
SEETEC DAESAN Port Pipeline Project |
2006.10~2007.12 |
C |
44 |
TAEYOUNG Tank Terminal Project |
2006.09~2007.02 |
E |
45 |
HONAM HEG D.I Water SYSTEM Project |
2003.09~2004.04 |
E.P.C. |