Oil & Gas Plant

E : Engineering / P : Procurement / C : Construction
No. NAME PERIOD REMARK
1 LG Chemical_ LG Chemical TPEE Project 2018.07~2020.01 E
2 Lotte Chemical_Yeosu H-COG, STG(Steam Turbine Generator) PROJECT 2018.04~2019.12 E.P.C
3 Wacker Chemical Korea _L7935 Site Extension Ulsan Project 2017.03~2019.06 E.P.C
4 Kolon Basf_BKA-1 PROJECT "MVR PLANT" Project 2017.03~2019.02 E.P.C
5 Hansol Chemical_Ulsan Steam Power Equipment Project 2017.02~2018.03 E.P.C
6 PT PATRASK_Fundamentals of Process Engineering Trainning 2016.05~2016.06 E
7 Lotte Chemical_¿©¼ö WAO Plant (EPC) 2016.06~2017.04 E.P.C
8 Korea Petrochemical Ind. _SOLUTION PILOT PLANT PROJECT 2016.05~2017.07 E.P.C
9 Kolon Global _BKA-1 PROJECT Engineering 2016.05~2019.02 E
10 Kuraray Korea_Ulsan Line 9 Project 2016.03~2017.12 E.P.C
11 LGMMA_PMMA Solution Process Engineering 2015.08~2015.12 E
12 Samsung Fine Chemical_T-2301 MVR System 2014.12~2016.04 E.P.C
13 Hyundae Oil Bank_#2 HOU Revamp Engineering 2014.01~2015.06 E
14 S-oil_#3 SRU TGCI(Tail Gas Catalytic Incinerator, CB&I Licensor) Project 2014.03~2014.12 E.P.C
15 UGCC Water Treatment Project 2013.03~2014.05 E.P
16 UGCC WAO Project 2013.01~2014.05 E.P
17 THAI UAC PP(Gas Separation) Project 2012.07~2013.04 E.P.C.
18 QLC PX Revamp Project 2012.06~2013.11 E
19 HYUNDAI OIL BANK LNG Pipeline Project 2012.06 ~2012.09 C
20 LG TOYO B2B Pilot Plant Project 2012.05~2012.09 E.P.C.
21 HYUNDAI OIL BANK # 1 Alkylation Revamp Project 2012.08~2013.06 C
22 HYUNDAI OIL BANK Alkylation Revamping(Engineering) Project 2012.04~2013.06 E
23 LG CHEMICAL MS Letdown Facility Project 2012.03~2012.05 C
24 LG CHEMICAL Polishing Slurry Recycling Project 2012.03~2012.08 C
25 S-OIL Tail Gas Catalytic Incineration Project 2011.07~2012.01 E.P.C.
26 SAMSUNG ENGINEERING Eni Zubair DGS South Package Project 2011.07~2011.08 E
27 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E
28 THAI HMC PP Project 2011.04~2012.06 E.P. C.
29 LG CHEMICAL No.2 CA/EDC Project 2011.04~2012.12 E
30 GS CALTEX No.1 PX Revamp Project 2011.03~2011.12 E
31 QATAR Barzan Engineering Service Project 2010.09~2010.10 E
32 LG CHEMICAL PE Revamping Project 2010.09~2011.06 E.P.C.
33 LG CHEMICAL COLD BOX Project 2010.09-2010.11 E.P.C.
34 YEOCHUN NCC BTX#1 Sulfolane Unit Revamping Project 2010.09-2010.12 E
35 HYUNDAI OIL BANK HDO/ HCP Equipment Project 2010.04~2010.06 C
36 LG CHEMICAL BUTENE-1 Project 2008.12~2009.06 E.P.C.
37 LG CHEMICAL CAA Revamping Project 2008.09~2009.05 C
38 CPC Dearomatic Plant Engineering Service Project 2008.05~2009.05 E
39 LOTTE CHEMICAL NCC/BRU/BDR Intertray Project 2007.12~2008.06 C
40 SAMSUNG TOTAL HPEO Column Revamping Project 2007.08~2008.03 E.P.C.
41 LOTTE CHEMICAL Wet Air Oxidation Project 2007.07~2008.04 E.P.C.
42 LG CHEMICAL OS-BOG Unit Project 2007.06~2008.04 E.P.C.
43 SEETEC DAESAN Port Pipeline Project 2006.10~2007.12 C
44 TAEYOUNG Tank Terminal Project 2006.09~2007.02 E
45 HONAM HEG D.I Water SYSTEM Project 2003.09~2004.04 E.P.C.